Page 11 - GETELEC catalogue US 2020
P. 11
D USAGE REQUIREMENTS
16 I.P. sealing
• Dripping
• Projection
• Immersion
• Dust
17 Is the system pressurised? To what pressure? With what gas?
18 Nature of mounting and surface protection.
19 Galvanic compatibility.
20 Positioning of product.
• Time planned for positioning product
• Accessibility of mounting
• Manual placement
• Automatic placement
• Adhesiveness of product
21 Frequency of opening and closing the equipment.
• Is the sealing system changed every time it is opened?
E FINANCIAL CONSTRAINTS
22 Planned budget for sealing and shielding.
23 Number of systems to be built? At what rate?
24 Impact of these requirements on the system's functionality.
10